Open House On Highway 4 Work 29 May 14

Everyone interested in the reconstruction of Highway 4 through St. James is encouraged to attend an open house today (THU). The proposed project would extend from south of the Watonwan County Fairgrounds to 11th Avenue North, and include utility replacement, upgrades to sidewalks and pedestrian ramps, new lighting, and intersection and access revisions. Mn-DOT engineers and St. James city planners are ready to narrow down the project designs, and are looking for feedback during today’s open house. It takes place from 5-7pm at the Watonwan County Library in St. James, with an informative presentation scheduled for 5:30.