Courtland Sidewalk Work Begins 13 May 13

Crews are expected to begin reconstructing the sidewalks along Highway 14 in Courtland today (MON). The project includes removing the existing sidewalks and constructing new concrete sidewalks and pedestrian curb ramps from Red Shoe Drive to Fiemeyer Drive. The shoulders and sidewalks along Highway 14 in Courtland will be closed during the construction, and driveway approaches will close for short periods as they are paved. Work is expected to be completed in around two weeks. Courtland pedestrians will then have accessible sidewalks that comply with the federal Americans with Disabilities Act.